f
l
TAGS
H

New Case Study: Christchurch Transitional Cathedral

Fletcher Reinforcing’s Christchurch branch recently completed the supply and install of 210 tonnes of reinforcing steel to allow the new Transitional Cathedral slab to be poured in Christchurch. No pressure on this job – just national TV crews booked to film the pour live on television. Of course the job was completed on time and to specification.

View the Christchurch Transitional Cathedral case study